2016年1月28日星期四

Goldea's Bathroom Cabinet Technical Process

Goldea's Bathroom Cabinet Technical Process

Brief Description of Goldea's Bathroom Cabinet Technical Process
STEP 1: Cutting
1. Choose the required board according to the requirements of the drawings and task scheduler list.
2. Start the computer, make certain machine program with the computer programming system according to the drawing required size, quantity of the panel, then input the panel cutting method completely in one time.
3. Place panels on the table of the electronic cutting machine in order first, and then push panels into the machine, start the program, adopts the method of starting from big size to small size. In Goldea, first of all, workers must keep away from the working countertops, pay attention to their safety.
4. Put the plate on the pallet neatly after cutting and check whether the material has collapse, scratches or holes, then fill out the process chart and labels. Send the panel to the inspection area with drawing for instance
Equipment: Italy SCM Sawing Machine
    STEP 2: Punching
1. Choose the board according to the requirements of drawings and task list, then find the out the quantity and model.
2. Start the power source program working procedure according to the technique requirement.
3. Put the board to the specified drilling position.
4. Check the first board to see if it matches the drawing and mass production is only allowed after such confirmation.
5. Clean the drilled board, set a complete set of products on the pallet neatly. Carefully fill in the production chart and label, send them together to the inspection area for check.
Equipment: Automatic Drilling Machine
STEP 3: Edge banding
1. Open the power supply, start the machine for preheating until the temperature get up to 180 degrees (takes about 30 male clock time).
2. Find the required banding matched with the board according to the requirements of drawings and task list, then install them on the machine
3. Find the required board according to the requirement of the drawings and task list, and find exact quantity and item number. Put the board on the conveyor belt, after cleaning up dust, glue stains, residue , start edge banding.
4. Check whether the temperature is reached to 180 degrees. After reaching to 180 degree, open the machine switch, started working in banding edge.
5. The assistant worker should check the brightness and firmness of finished board. If banding is too long for the board, workers shall refine it by hand. After the whole operation, clean up the board and set them on the pallet in order.
6. Fill in production chart and label, and check the quantity, type, sent them to semi-finished products inspection area for check.
7. Equipment: machine: automatic scm edge banding machine, automatic ab106 edge banding
Machine, Automatic Homag Edge Banding Machine
STEP 4: Carving
1. Turn on the power of curve machine, and start computer and design software. Start the design software, draw certain pattens by using the design software according to the drawing requirements, then store the pattens design and transfer it to design program.
2. Place the carve workpiece on the workbench for carving.
3. Choose and install the corresponding carving knife from the knife box according to the requirement of the carving craft, start the program, and start carving.
Equipment: Cnc Curving Machine
STEP 5: PVC thermo foiling
1. Find board according to the requirement of the drawings and task list, check the number and ensure each board is smooth and clean.
2. Spray adhesive on the board, spray a little more around the side of the board and spray a little less on the surface. Ensure the smoothness of surface and edge fastness. After spraying, dry it  for the thermo foiling.
3. Set the preheating temperature. Adjust machine to be ready for work.
4. After dry, put board on the machine, pay attention to clean up the surface dust to prevent the occurrence of pitting and particles in the surface.
5. Put the required PVC, start thermo foil. The step is close mould—dry PVC –vacuum press –release vacuum press –release press –take off mould –finish
6. Carefully after discharge to be good membrane sheet metal into the trimming table, neatly packed into pallets for trimming.
7. After Trimming the finished product, check whether there is wrinkling, pay attention to  any possible scratch.
8. Check the quantity, and fill item number, quantity, PI no. And color in the production chart, send to the inspection area for check.
Equipment: Thermo Foiled Machine
STEP 6: Assembly
1: Open The Package
1. Open the packing and figure out the number of products, if the word "5-1" are printed on the carton, it means the products is five cases in a total, then count the number first;
2. Open the carton packag, put the hardware pack into a separate container and count alone, in case of losing;
3. Read The installation drawing carefully, count all panel.
2: Separate Panel
1. Place the panel separately for better checking the number and corresponding installation;
2. Prepare a cross screwdriver.
3: Installation Of Drawer Slides
1. Take out the slide rail and sides;
2. According to the mounting holes on the side panel, screw 8 mm flat head screw in to the hole.
4: Install Fittings
1. Remove the combination screw (including discus and screw, screw respectively, such as sheet metal positive or side;
2. Load the wood tenon, be careful not to repeat the corresponding hole.
5: Assembling Cabinet Body
1. Connect back board and side board by wood plug and cam lock
2. Connect bottom board and side board by wood plug and cam lock
3. Assemble hanger on the side panel
4. Assemble front panel by cam lock
6: Cabinet Body Has Been Finished
7: Assembling Drawer
1. Assemble side panel and back panel of drawer by using 25mm screw
2. Insert bottom panel of drawer
3. Assemble front panel of drawer by cam lock
4. Assemble drawer handle and insert the drawer
8: Output Drawer To Test It
9: Assemble Shelf And Door
1. Insert shelf into the cabinet
2. Assemble hinge into the round hole on the door
3. Assemble the door with side panel
10: Adjust The Door
1. Put the cabinet in the suitable place, if the place is not flat
2. Adjust screw in the hinge can keep the door on the same line
11: Assemble Is Finished
STEP 7: Packaging
Cabinet packaging
1. Wrap the foam paper around the products. Take care of the front side.
2. Add the 2cm polyfoam to six sides.
3. Put the update paper corner protection
4. Package finish
Basin packaging
Use the polyfoam to protect the edge
Use the special polyfoam to protect the back
Use 4 pcs polyfoam to protect the corner
Use the paper to support the basin, it will keep the basin not moving.
Mirror packaging
1. Use the palstice corner for four corners
2. Use the “U” shape polyfoam around
3. Whole big polyfoam for both sides
4. Packing it with foam paper
5. Put it in the carton

Goldea (Zhejiang Jindi Holding Group Co., Ltd), founded in 1986, is a professional manufacturer, dealing with R&D, producing and selling of top-grade bathroom furniture/ vanity/ cabinet, door and other home furnishing products, and has now more than 2000 staff, covering an area of 180000 square meters with group headquarters located in China. south of the World Wonder Qian Tang Tidewater Xiao Shan District, Hangzhou city. Goldea is a bathroom furniture manufacturer who, through high-quality products and discerning design to inspire people, for whom the bathroom is an important part of living space and a personal expression of attitude towards life.


Goldea in KBIS Fair


Goldea's products are carried out strictly in accordance with the ISO9001 quality system, 6S management model and the BSCI social responsibility requests. As a company being evaluated as AAA-grade quality by Zhejiang Province, Goldea has already become a famous brand in China.


As a leading bathroom furniture manufacturer in China, Goldea is a private enterprise of abundant funds, advanced technology and machines. Our products range from high-grade thermos foil bathroom cabinets, MFC athroom cabinets, Lacquered bathroom cabinets, basins and mirror cabinets to other various bathbroom accessories. Goldea has its own lab for hardware accessories for 48 hours salt spray test, and other physical and chemical test as CE, E1, REACH, FSC, etc.


As an industrial leader, Goldea company has many product patents and design innovation awards. Despite the focus on innovation and bathroom solutions, Goldea is highly proud of its excellent customer service. It holds the belief of providing the first-class products and services.


We accepts overseas customer’ order of OEM, ODM and other cooperation. We sincerely hope that we could establish a long-term business relationship with more customers on the basis of honesty, equality and mutual benefits.



Warmly welcome you to visit us.

没有评论:

发表评论